Inmed

EVM PLUS Capsule 10's

MRP ₹170.00 (Inclusive of all taxes)
Deliver to

Netmeds First Membership

Starting at just ₹[] for 3 months.
View Plans

Introduction About EVM PLUS CAPSULE

EVM Plus Capsule is a nutraceutical supplement used to manage metabolic syndrome (obesity, Type 2 diabetes mellitus, hypertension, and coronary artery disease). It contains Omega 3 fatty acids, Green tea extract, Lycopene, Lactic acid bacillus, Grape seed extract, Chromium, Multivitamins, minerals, and Amino acids as active ingredients that help to provide nutritional requirements of the body improve heart health, and boost immunity and metabolism.

Omega 3 fatty acids help to improve heart health by regulating cholesterol levels. Amino acids help to improve heart health. Multivitamins improve the health of nerves, blood vessels and heart as well as help to improve immunity and metabolism. Grape seed extract helps to control high blood pressure and improve heart health. Minerals help for healthy body functioning.

Always take EVM Plus Capsule exactly as advised by your doctor. Swallow EVM Plus Capsule with a glass of water. Do not exceed the stated daily recommended dosages.

Key Composition

  • Omega 3 fatty acid
  • Antioxidants – grape seed extract, lycopene
  • Multivitamins – vitamin A, B1,B2,B6,B12,C, E, Niacinamide, folic acid, biotin
  • Amino acids- L-lysine, L-glutamine
  • Minerals – copper sulfate pentahydrate, sodium selenite pentahydrate, magnesium sulfate, manganese sulfate, sodium molybdate, chromium picolinate, nickel sulfate, dibasic calcium phosphate, sodium metavanadate

Author Details

Written By Dr. Dhivakaran R - BDS
Reviewed For Accuracy By Dr. Shruthi Raikar - BDS
Last updated on 28 Apr 2023 | 12:52 PM(IST)
Lab updated